Keltbray is handling the demolition of 10 Broadway. Keltbray are the UK’s leading specialist demolition and Civil Engineering contractor and have a wealth of experience and capability gained from the successful delivery of numerous complicated redevelopment projects. 

Progress on site to date 

Common Ground Level 

  • Set up 24/7 site security 
  • Baseline environmental monitoring underway 
  • Completed site setup / welfare and offices within designated compound ares
  • Progressive erection of site perimeter hoarding 
  • Erection and modification to existing access gates for pedestrian and vehicles 
  • Installation of demolition tower crane 
  • Isolation and disconnection of existing services within building line 

Tower Block 

  • Commenced erection of the encapsulated demolition scaffold including Victoria Block 
  • Refurbishment and demolition asbestos survey ongoing 
  • Commenced pre-asbestos soft strip 
  • Commenced removal of asbestos and other hazardous materials

Presentation (PDF – 2.8 MB)

The Broadway Demolition & Enabling Works Construction Logistics Plan (PDF – 849 KB)